Slovakia – Batteries – Battery energy storage system in EBO (BESS EBO)

Publicado el 22 de diciembre de 2025

Tender Description

The objective of the project is the supply, construction and commissioning of a battery storage system (BESS) with an installed capacity of minimum 89 MW in two units of 2 x 44.5 MW and a total capacity of minimum 178 MWh, on the existing site of the Slovak Nuclear Power Plants, where the capacity of the storage system must be twice the installed capacity.