Tendee LogoChatBlog
Public Tender Opportunity

Jordan – Works for complete or part construction and civil engineering work – Design Build and Operate (DBO) of the Wadi Zarqa Wastewater Treatment Plant Phase 1

Published on October 23, 2025

Tender Description

Wadi Zarqa WWTP, based on current flow projections, is planned to be implemented in two phases: Phase 1 aims to achieve a wastewater treatment of 150,000 m3/day by 2030. Phase 2 is planned to add additional capacity of 200,000 m3/day to Phase 1, achieving a total project capacity of 350,000 m3/day by 2034-2035. The project scope, is for the Design, Build and Operate of the Phase 1 of Wadi Zarqa Wastewater Treatment Plant (WWTP) and associated facilities. The project scope includes but is not limited to the design, permitting, supply, delivery, construction, commissioning, operation, maintenance and transfer of the Wadi Zarqa WWTP, with a Phase 1 treatment capacity of 150,000 m3/d, an approximately 1.4 MW hydropower plant, the conveyance system from the West Zarqa Pump Station (WZPS) to Wadi Zarqa WWTP including 12 km of pipeline with a diameter to be confirmed (estimated at up to 1,600 mm), as well as the expansion of the pre-treatment facility at WZPS.

Unlock Full Tender Insight

Complete details, deadlines, and AI-powered analysis are available inside the tend.ee platform. Create your free account to access.

It's free to get started. No credit card required.