Norway – Architectural, construction, engineering and inspection services – Preparation of a planning programme, development plan and construction plan - new thirteen bridge in Øyer municipality - Stage 1
Tender Description
Thirteen bridge (built in 2012) collapsed 15 August 2022. The bridge is connected to the east and west side of Thirteen together and it is a part of county road 254. The bridge was a truss bridge made of steel and wood. The main span was 70 metres and a total of 148 metres of bridge with two lanes and pavements was initiated. Temporary bridge, stand-by bridge loaned by the Norwegian Public Roads Administration, came into place in the summer of 2023. Temporary bridge has 10 years approval. A feasibility study was first prepared, of which four different placements were assessed. Here a new bridge was adopted near the existing bridge. The location had to be directly upstream or downstream, as the existing location was "seized" by a temporary bridge. The draft project provided further details on the feasibility study. The recommendation from Cowi was submitted in January 2024. The sketch project assessed 3 different routes in connection with the existing bridge, as well as 3 different bridge types. The recommendation was a steel and concrete work bridge, with a culvert over the E6. The recommended route was straight upstream for the existing bridge. The feasibility study and sketch project are included in the tender documentation.
Unlock Full Tender Insight
Complete details, deadlines, and AI-powered analysis are available inside the tend.ee platform. Create your free account to access.
It's free to get started. No credit card required.